Other completed projects 2014-2016

Client: Dani and Matt

Suburb: Wesburn

Project: Pool surround, sandstone paving and stone wall

Duration: 4 weeks

Scope: Finish off pool area. Relay paving and insert strip grate along deck to stop storm water flooding under house. Link driveway with house via curved sandstone path.

Process:

 

 

 

Client: Julie

Suburb: Yellingbo

Project: Bluestone random crazy paving, concrete retaining wall

Duration: 2 weeks

Scope: Install concrete retaining wall to support new concrete slab for shed and bluestone pave old concrete slab

Process:

 

 

 

 

Client: Yarra Ranges Council

Suburb: Warburton and Yarra Junction

Project: Repair stone wall at Thomas Avenue, Warburton.

Repair 120 year old plus stone entrance where truck had destroyed a pier on Riverview Parade, Launching Place.

Duration: 4 weeks

Scope: Reinstate stone walling and make safe as a public space.

Process:

 

 

 

Client: Evan

Suburb: Cockatoo

Project: Repair stone wall, random bluestone paving, brick edging, strip grates and exposed concrete driveway and paths.

Duration: .5 week

Scope: Repair circular stone wall, that had cracked from palm tree roots

Process:

 

 

 

Client: Karen

Suburb: Mitcham

Project: Repair rendered brick wall

Duration: 1 week

Scope: Replace single brick wall with double brick and remove damaging Cordylines and then rende

Process:

 

 

 

Client: Metro Fire Builders

Suburb: Glen Waverley

Project: Waterproof raised garden bed, install sign and core drill retaining wall for drainage. Test irrigation and tidy up garden beds

Duration: 1 week

Scope: Stop water entering building.

Process:

 

Nursery fit out

Client: Southern Rainforest

Suburb: Launching Place

Project: Fit out American Barn/first rainforest nursery

Duration: 8 weeks

Scope: Fit out building for nursery operations

Process:

 

 

Launching Place rainforest nursery barn at lock up

Client: Southern Rainforest

Suburb: Launching Place

Project: Build American Barn/first rainforest nursery to lock up

Duration: 12 weeks

Scope: Construct treated pine frame, clad with reclaimed Cypress windbreaks. This will facilitate nursery operations

Process:

Slab was allowed to cure and then set out began. Eric Voorzaat from Bushblend Homes was the contracted carpenter.

 

 

Above: On left Eric Voorzaat from Bushblend Homes, thanks so much for all your brilliant work, very talented and the barn doors are a work of art. Brett Cowan, Managing Director of Southern Rainforest and Darren Bourne on right who tirelessly oiled all the Cypress cladding and a whole lot more.

Above: Brett Cowan pictured with his wonderful and loving family. Thanks to my wife Lauren and children Maddie and Zach for all your patience, support, commitment and focus.

 

Nursery foundation

Client: Southern Rainforest

Suburb: Launching Place

Project: Nursery fill pad, stone retaining wall, screw piles and concrete slab

Duration: 14 weeks

Scope: Raise building envelope above 1 in 100 year flood level, retain fill pad with stone walls, then use steel and concrete to provide solid foundation

Process:

IMG_5780IMG_5829IMG_6458IMG_5938IMG_6031IMG_6079IMG_6099IMG_6410IMG_6458IMG_6502IMG_6513IMG_6522IMG_6810IMG_6921IMG_6928IMG_7192IMG_7287IMG_7297IMG_7448IMG_7464IMG_7495IMG_7502IMG_1852IMG_1856IMG_1879IMG_1890

 

 

Bluestone capped dry-stone retaining wall

Client: Damian.

Suburb: Don Valley.

Project: Stone retaining wall.

Duration: 3 weeks.

Scope: Dry stone retaining wall with bluestone capping and base of wood fired oven.

Process:

IMG_6490

IMG_6497IMG_7212IMG_7322IMG_7266IMG_7372IMG_7384IMG_7394IMG_7399IMG_7401IMG_7402IMG_7403IMG_7432IMG_7433

Hawthorn East exposed

Client: Natalie and Dean

‘We’re more than happy with the process, communication, attention to detail, value and most importantly, the RESULT! We not only recommend Southern Rainforest for your garden, but strongly insist you get a quote for your Landscaping needs.’

Suburb: Hawthorn East

Project: Front and back garden

Duration: 8 weeks

Scope: Install exposed aggregate concrete drive and pathways, drainage, irrigation, planting and lighting.

Process:

Below: Started by removing old lawn, shrubs and driveway. IMG_5152102103104   Below: Concrete slab for shed base.105   Below: Installing paved edge.107106109110111   Below: Installing automated irrigation system.112   Below: Turf and plantings installed before concrete.113114   Below: First glimpse115116117   Below: Pouring front driveway.118   Below: Expansion cuts.119     Below: Starting to take shape.121122123125127128130131132133135136137138139140141142143144145146147 148

Bluestone exposed

Client: Ann & Ken

‘Brett Cowan and Southern Rainforest have recently completed remodelling our front drive, path, entrance and lawn. The job was started and completed on time, and we are very pleased with the result and workmanship. Brett is very reliable and professional. I have no hesitation in recommending him to any prospective clients.’

Suburb: Glen Iris

Project: Front yard

Duration: 4 weeks

Scope: Remodel dated front entrance and driveway, replace with sawn bluestone and exposed aggregate concrete.

Process:

Below: Existing paving, capping and steps removed and recycled.

IMG_3067 IMG_3070 IMG_3072 IMG_3485 IMG_3486 IMG_3489 IMG_3493

Below: Bluestone custom cut and laid as edge, steps and path.

IMG_3665IMG_3668

Below: Bluestone and exposed aggregate concrete was then sealed for wet look finish. Synthetic turf replaced pebbles and pavers.IMG_3726 IMG_3730 IMG_3759 IMG_3764 IMG_3767 IMG_3772 IMG_3774 IMG_3775 IMG_3780 IMG_3782 IMG_3788 IMG_3797 IMG_3799 IMG_3800 IMG_3808 IMG_3831 IMG_3835 IMG_3775

Courtyard retreat

Client: Elizabeth & Michael

Suburb: Glen Iris

Project: Backyard

Duration: 11 weeks

Scope: Transform sloping block into a spacious and functional outdoor room.

Process:

Driveway and three established trees were retained and pavers were reused.

IMG_3159

IMG_2889

IMG_2898

IMG_3142

Side boundary fence was replaced

IMG_3167IMG_3080

IMG_3076

Excavation work began and over 50 cubic metres of soil was removed

IMG_3187IMG_3083

IMG_3078

 

Drainage was then installed

IMG_3103

 

Steps built at each doorway

IMG_3216

IMG_3170

 

Herringbone pattern

IMG_3233IMG_3261IMG_3420

 

Starting to take shape

IMG_3286IMG_3410

 

Planting, irrigation and mulch finished the project

IMG_3337IMG_3405IMG_3408IMG_3417IMG_3420IMG_3422IMG_3425IMG_3428IMG_3443IMG_3447IMG_3454IMG_3425 - Version 2

Child friendly garden

Client: Rachel & Andy

Suburb: Glen Iris

Project: Back garden

Duration: 7 weeks

Scope: Design a child friendly garden, with no steps, on a gently sloping block.

Process: Started  project by stockpiling topsoil.

IMG_1051

IMG_1047

IMG_1042

 

Hardscaping of edging and paving completed.

IMG_2866IMG_1168

 

Project was completed with the addition of irrigation, topsoil and instant turf, (clients completed mulching and planting).

IMG_2951IMG_1321IMG_1316IMG_1290IMG_1278IMG_1277IMG_1275IMG_1272