Other completed projects 2014-2016

Client: Dani and Matt

Suburb: Wesburn

Project: Pool surround, sandstone paving and stone wall

Duration: 4 weeks

Scope: Finish off pool area. Relay paving and insert strip grate along deck to stop storm water flooding under house. Link driveway with house via curved sandstone path.

Process:

 

 

 

Client: Julie

Suburb: Yellingbo

Project: Bluestone random crazy paving, concrete retaining wall

Duration: 2 weeks

Scope: Install concrete retaining wall to support new concrete slab for shed and bluestone pave old concrete slab

Process:

 

 

 

 

Client: Yarra Ranges Council

Suburb: Warburton and Yarra Junction

Project: Repair stone wall at Thomas Avenue, Warburton.

Repair 120 year old plus stone entrance where truck had destroyed a pier on Riverview Parade, Launching Place.

Duration: 4 weeks

Scope: Reinstate stone walling and make safe as a public space.

Process:

 

 

 

Client: Evan

Suburb: Cockatoo

Project: Repair stone wall, random bluestone paving, brick edging, strip grates and exposed concrete driveway and paths.

Duration: .5 week

Scope: Repair circular stone wall, that had cracked from palm tree roots

Process:

 

 

 

Client: Karen

Suburb: Mitcham

Project: Repair rendered brick wall

Duration: 1 week

Scope: Replace single brick wall with double brick and remove damaging Cordylines and then rende

Process:

 

 

 

Client: Metro Fire Builders

Suburb: Glen Waverley

Project: Waterproof raised garden bed, install sign and core drill retaining wall for drainage. Test irrigation and tidy up garden beds

Duration: 1 week

Scope: Stop water entering building.

Process:

 

Utilising landscaping to link the old and the new.

 

Client: Steve and Lael

Suburb: Wandin

Project: Stone walls, random bluestone paving, brick edging, strip grates and exposed concrete driveway and paths.

Duration: 4 weeks

Scope: Unify older character Tudor syle home with new colorbond barn shed.

Process:

 

Nursery fit out

Client: Southern Rainforest

Suburb: Launching Place

Project: Fit out American Barn/first rainforest nursery

Duration: 8 weeks

Scope: Fit out building for nursery operations

Process:

 

 

Nursery foundation

Client: Southern Rainforest

Suburb: Launching Place

Project: Nursery fill pad, stone retaining wall, screw piles and concrete slab

Duration: 14 weeks

Scope: Raise building envelope above 1 in 100 year flood level, retain fill pad with stone walls, then use steel and concrete to provide solid foundation

Process:

IMG_5780IMG_5829IMG_6458IMG_5938IMG_6031IMG_6079IMG_6099IMG_6410IMG_6458IMG_6502IMG_6513IMG_6522IMG_6810IMG_6921IMG_6928IMG_7192IMG_7287IMG_7297IMG_7448IMG_7464IMG_7495IMG_7502IMG_1852IMG_1856IMG_1879IMG_1890

 

 

Bluestone capped dry-stone retaining wall

Client: Damian.

Suburb: Don Valley.

Project: Stone retaining wall.

Duration: 3 weeks.

Scope: Dry stone retaining wall with bluestone capping and base of wood fired oven.

Process: