Other completed projects 2014-2016

Client: Dani and Matt

Suburb: Wesburn

Project: Pool surround, sandstone paving and stone wall

Duration: 4 weeks

Scope: Finish off pool area. Relay paving and insert strip grate along deck to stop storm water flooding under house. Link driveway with house via curved sandstone path.

Process:

 

 

 

Client: Julie

Suburb: Yellingbo

Project: Bluestone random crazy paving, concrete retaining wall

Duration: 2 weeks

Scope: Install concrete retaining wall to support new concrete slab for shed and bluestone pave old concrete slab

Process:

 

 

 

 

Client: Yarra Ranges Council

Suburb: Warburton and Yarra Junction

Project: Repair stone wall at Thomas Avenue, Warburton.

Repair 120 year old plus stone entrance where truck had destroyed a pier on Riverview Parade, Launching Place.

Duration: 4 weeks

Scope: Reinstate stone walling and make safe as a public space.

Process:

 

 

 

Client: Evan

Suburb: Cockatoo

Project: Repair stone wall, random bluestone paving, brick edging, strip grates and exposed concrete driveway and paths.

Duration: .5 week

Scope: Repair circular stone wall, that had cracked from palm tree roots

Process:

 

 

 

Client: Karen

Suburb: Mitcham

Project: Repair rendered brick wall

Duration: 1 week

Scope: Replace single brick wall with double brick and remove damaging Cordylines and then rende

Process:

 

 

 

Client: Metro Fire Builders

Suburb: Glen Waverley

Project: Waterproof raised garden bed, install sign and core drill retaining wall for drainage. Test irrigation and tidy up garden beds

Duration: 1 week

Scope: Stop water entering building.

Process:

 

Utilising landscaping to link the old and the new.

 

Client: Steve and Lael

Suburb: Wandin

Project: Stone walls, random bluestone paving, brick edging, strip grates and exposed concrete driveway and paths.

Duration: 4 weeks

Scope: Unify older character Tudor syle home with new colorbond barn shed.

Process:

 

Bluestone capped dry-stone retaining wall

Client: Damian.

Suburb: Don Valley.

Project: Stone retaining wall.

Duration: 3 weeks.

Scope: Dry stone retaining wall with bluestone capping and base of wood fired oven.

Process:

IMG_6490

IMG_6497IMG_7212IMG_7322IMG_7266IMG_7372IMG_7384IMG_7394IMG_7399IMG_7401IMG_7402IMG_7403IMG_7432IMG_7433

Bluestone exposed

Client: Ann & Ken

‘Brett Cowan and Southern Rainforest have recently completed remodelling our front drive, path, entrance and lawn. The job was started and completed on time, and we are very pleased with the result and workmanship. Brett is very reliable and professional. I have no hesitation in recommending him to any prospective clients.’

Suburb: Glen Iris

Project: Front yard

Duration: 4 weeks

Scope: Remodel dated front entrance and driveway, replace with sawn bluestone and exposed aggregate concrete.

Process:

Below: Existing paving, capping and steps removed and recycled.

IMG_3067 IMG_3070 IMG_3072 IMG_3485 IMG_3486 IMG_3489 IMG_3493

Below: Bluestone custom cut and laid as edge, steps and path.

IMG_3665IMG_3668

Below: Bluestone and exposed aggregate concrete was then sealed for wet look finish. Synthetic turf replaced pebbles and pavers.IMG_3726 IMG_3730 IMG_3759 IMG_3764 IMG_3767 IMG_3772 IMG_3774 IMG_3775 IMG_3780 IMG_3782 IMG_3788 IMG_3797 IMG_3799 IMG_3800 IMG_3808 IMG_3831 IMG_3835 IMG_3775