Hawthorn East exposed

Client: Natalie and Dean

‘We’re more than happy with the process, communication, attention to detail, value and most importantly, the RESULT! We not only recommend Southern Rainforest for your garden, but strongly insist you get a quote for your Landscaping needs.’

Suburb: Hawthorn East

Project: Front and back garden

Duration: 8 weeks

Scope: Install exposed aggregate concrete drive and pathways, drainage, irrigation, planting and lighting.

Process:

Below: Started by removing old lawn, shrubs and driveway. IMG_5152102103104   Below: Concrete slab for shed base.105   Below: Installing paved edge.107106109110111   Below: Installing automated irrigation system.112   Below: Turf and plantings installed before concrete.113114   Below: First glimpse115116117   Below: Pouring front driveway.118   Below: Expansion cuts.119     Below: Starting to take shape.121122123125127128130131132133135136137138139140141142143144145146147 148

Courtyard retreat

Client: Elizabeth & Michael

Suburb: Glen Iris

Project: Backyard

Duration: 11 weeks

Scope: Transform sloping block into a spacious and functional outdoor room.

Process:

Driveway and three established trees were retained and pavers were reused.

IMG_3159

IMG_2889

IMG_2898

IMG_3142

Side boundary fence was replaced

IMG_3167IMG_3080

IMG_3076

Excavation work began and over 50 cubic metres of soil was removed

IMG_3187IMG_3083

IMG_3078

 

Drainage was then installed

IMG_3103

 

Steps built at each doorway

IMG_3216

IMG_3170

 

Herringbone pattern

IMG_3233IMG_3261IMG_3420

 

Starting to take shape

IMG_3286IMG_3410

 

Planting, irrigation and mulch finished the project

IMG_3337IMG_3405IMG_3408IMG_3417IMG_3420IMG_3422IMG_3425IMG_3428IMG_3443IMG_3447IMG_3454IMG_3425 - Version 2

Low maintenance luxury

Client: Winifred

‘I am pleased to say that I have been extremely satisfied with the work carried out by Brett Cowan and Southern Rainforest. The landscape, design & construction work is of excellent standard & I have no hesitation recommending Brett for this type of work.’

Suburb: Glen Iris

Project: Back Garden

Duration: 8 weeks

Scope: Transform labour intensive yard into low maintenance and enjoyable garden

Process:

Backyard was a mix of different materials and was constant upkeep, as well as not being very useable. Bluestones were reused as an edge, whilst other materials were recycled.

IMG_1237

IMG_1238 IMG_1239 IMG_1240 IMG_1244

 

Footings were installed and blockwork constructed. Due to narrow access, all material had to be wheeled in by hand.

IMG_2971 IMG_2977 IMG_2998 IMG_3004

 

After compaction, reinforced concrete slab was installed and paving laid, grouted and sealed. Other additions were, synthetic turf, clothesline, sideway stepping stones, bluestone path, steps, edge and mulching.

IMG_1704IMG_1695IMG_1681IMG_1674IMG_1672IMG_1667IMG_1663IMG_1641IMG_1629

IMG_1617IMG_1610IMG_1619IMG_1634

Child friendly garden

Client: Rachel & Andy

Suburb: Glen Iris

Project: Back garden

Duration: 7 weeks

Scope: Design a child friendly garden, with no steps, on a gently sloping block.

Process: Started  project by stockpiling topsoil.

IMG_1051

IMG_1047

IMG_1042

 

Hardscaping of edging and paving completed.

IMG_2866IMG_1168

 

Project was completed with the addition of irrigation, topsoil and instant turf, (clients completed mulching and planting).

IMG_2951IMG_1321IMG_1316IMG_1290IMG_1278IMG_1277IMG_1275IMG_1272

Balwyn Backyard

Clients: Sally & Rob

Suburb: Balwyn

Project: Backyard

Duration: 5 – 6 weeks

Scope: Clients had tried previously to landscape garden, though were extremely time poor and as such could not complete project. Being engineers they designed lay out and positioning of wall. Was quite complex due to clients not wanting drains or grates and so all paved area had to fall away from house and at the same time not pool along wall.

Process: On east side of house  paving commenced with a small courtyard

 

Then work commenced on westside of house, pool and paving was to remain, though everything else was to go.

Then clean up began and the construction of the great wall began.

 

Once complete concrete base was installed.

 

Then paving of 800 x 400 sandstone was laid.