Balwyn Backyard

Clients: Sally & Rob

Suburb: Balwyn

Project: Backyard

Duration: 5 – 6 weeks

Scope: Clients had tried previously to landscape garden, though were extremely time poor and as such could not complete project. Being engineers they designed lay out and positioning of wall. Was quite complex due to clients not wanting drains or grates and so all paved area had to fall away from house and at the same time not pool along wall.

Process: On east side of house  paving commenced with a small courtyard

 

Then work commenced on westside of house, pool and paving was to remain, though everything else was to go.

Then clean up began and the construction of the great wall began.

 

Once complete concrete base was installed.

 

Then paving of 800 x 400 sandstone was laid.